WYG International - Fire Damage
Project Details
Extensive Fire damage at this four bedroom detached house required repair throughout. The scope of works included:
Roof stripping and preparatory works prior to reinstating pitched roofs at the front and rear elevations, asbestos cement removal and shot blasting to soot damaged areas. Removal and replacement of plasterboard ceilings to the majority of rooms, a full electrical rewire and installation of new kitchen and bathroom suites. Flooring tiling and decorating throughout the property.
The project was complex but at completion all parties we're delighted with the finished result.